Industries · Vehicle wrapping, bodywork, paint
Multi-day work, split across bays
A paint job or a full wrap takes days. The calendar needs to handle long blocks, not half-hour slots.
1-5
days
2
bays
deposit
required
A multi-day block as one booking
Assessment as a separate service
Deposit for material costs
What it solves
The car stays for days
Multi-day block
The job reserves the bay as a single, long booking.
Assessment
A short, separate service before the quote.
Deposit
Material costs can be collected upfront.
Type and job
Collected at booking, so the estimate is accurate.
Typical setup
Two work bays
Fewer jobs, but high value each - block length and the deposit are the two critical points.
Assessment30 min
Before the quote, as a separate service.
Partial wrap1 day
A single block.
Full wrap3-5 days
A long block, the bay reserved.
Paint job2-4 days
Including drying time.
Deposit30-50%
For material costs.
FAQ
Questions for bodywork shops
Blocks, assessment, deposit.
Like the AI chatbot?Get one just like it for your own business.Yes, the service length can be set in days too.
Worth it: it's short, and doesn't tie up the work bay's time.
Yes - standard practice for material-heavy jobs.
Yes, each one is its own resource.
The next bookings can be rescheduled, and customers are notified.
14 days free, no credit card required · SolvePly Kft.
Start today - your first booking arrives tomorrow
Set up your schedule and services, get a link. The rest takes care of itself.
No lock-inReady in 15 minutesUnlimited bookings
booking.meetply.com/your-name
9:00Check-upfree
10:30Consultationfree
13:00Treatment1 spot
MeetPly · 0 double bookings